This paper considers the selection of head-of-wall joint systems
for fire-rated partitions intended to accommodate structural deflection.
Applicable regulations and test standards are reviewed, and the
extent of floor system deflection is discussed. The paper concludes
with comparisons of the available systems and recommendations for
their selection and detailing. .
Floor
systems deflect under live load. If the floor above a full-height
partition deflects sufficiently, the wall and the smoke/fire seal
at the top could be damaged. If the floor below the partition deflects,
a gap could open at the top allowing passage of smoke and fire.
With this concern in mind, our vigilant code writing community has
introduced standards in the past few years to guard against this
threat. Under the 1997 UBC, the joint between the top of a partition
and the floor structure above it must be sealed with an assembly
that meets stringent testing standards.
The Rationale For Use of Deflection Joints
Where does the code require these joints? Section 706 (Fire-Resistive
Joint Systems) of the 1997 UBC requires that deflection joints between
fire-resistive floor and wall systems be fire tested in accordance
with UBC Standard 7-1. ICBO also publishes an "Acceptance Criteria"
document for testing of joint systems. This document, ICBO-AC30,
recognizes UL Standard 2079 as an acceptable alternate testing standard.
UL 2079 is very similar to UBC Standard 7-1, but allows small-scale
testing in place of full-height wall testing. Most manufacturers
use the UL 2079 standard.
One manufacturer has sent out literature lately claiming to have
the only code-compliant system available on the market, because
they are the only ones whose testing conforms to UBC Standard 7-1.
However, the use of alternative systems is allowed by UBC Section
105, and therefore assemblies tested under either UBC Standard 7-1
or UL Standard 2079 are acceptable.
How are head-of-wall joints tested?
Under UL 2079, the lower portion of the joint assembly is cycled
up and down through its full range of motion 500 times, after which
the joint is checked to see if it's still intact. It is then cycled
to its most wide-open position and moved into a fire-testing furnace.
After an hour of the fire test under positive pressure, the temperature
on the furnace side of the wall will have reached 1,700 degrees
F. Meanwhile, the temperature sensors on the cool side have to remain
below about 320 degrees and the wall can't leak any hot smoke or
gasses. While the wall is still hot, they blast the joint with a
fire hose stream to see if the impact or temperature shock of the
pressurized water will damage it. Any excess temperature rise, hot
gas leakage or hose stream water penetration will cause the assembly
to fail the test.
How much do floor systems deflect?
The
typical standard for structural deflection design in floor assemblies
is L/360. Thus, a 30-foot beam is designed to deflect up to one
inch under its design load. In a 30 X 30-foot structural bay, the
main beams could deflect an inch and the intermediate purlins could
deflect an additional inch, for a 2-inch total in the center of
the bay. Keep in mind, however, that a floor system is almost never
loaded to full design capacity, the beams are rarely designed to
their maximum allowable deflection, and various safety factors and
structural interactions serve to limit deflection even further.
Curiously, our structural engineers seem unanimous in advising us
to provide for 1û2-inch or 3û4-inch deflection for almost any structural
system or bay size.
Perhaps the most significant aspect of this test is not specified
by the test standard. The actual distance that these head-of-wall
joints are designed to deflect is left up to one's engineering judgement.
Architects typically call upon structural engineers to specify that
distance. The movement capabilities of tested assemblies in the
UL Directory range from 1/8-inch up to 3 inches in each direction.
As mentioned below, there is almost no record of interior partition
damage due to deflection, except in severe earthquakes. It seems
likely that the calculated extent of floor deflection is greatly
overstated in most cases.
Varying Deflection Terminology
Manufacturers typically list the total (fully compressed to fully
extended) movement capability of their joint systems, whereas structural
engineers state requirements in terms of the simple deflection of
each floor system separately. If your engineer requires 1û2-inch
deflection capability for each floor, you need to choose a system
that has a 1-inch total movement capability. The UL Directory lists
the "Nominal Joint Width" for each deflection joint plus its "Movement
Capabilities" as a percentage of the joint width. Thus, a 3û4-inch
nominal joint width with 33% movement capability in both compression
and extension would allow 1û4-inch movement each direction, or 1û2-inch
total.
What Happens If You Don't Provide Enough Deflection Capacity?
If you were to look back in time to the early 1980's, you might
have a hard time remembering how architects solved this deflection
problem. This would be because the profession typically either ignored
the issue entirely or utilized some homemade solution. During the
following decade, more awareness about the issue developed, and
many architects began using nested track assemblies or V-grooved
"deflection track" for their head-of-wall joints.
At the same time, concern was growing about the best practices for
sealing all kinds of joints and penetrations in fire barriers. It
had been noted, appropriately enough, that just stuffing some mineral
wool around a pipe where it passed through a floor slab did not
create a permanent barrier to the spread of fires. In addition,
the 1994 Northridge earthquake spurred a wave of reforms for working
more effectively with seismic and other building movements.
Earlier this year, I began a review of this problem in order to
select a design standard that could economically and effectively
seal rated head-of-wall joints. Using the 1û2-inch minimum deflection
standard provided by my engineer, I found just a handful of rated
assemblies that would qualify. However, a contractor had been lobbying
a client of mine to approve one of the elastomeric spray fire sealants
on the market that had only 3/8-inch movement capacity. In response,
I began investigating what would happen if the assembly did not
accommodate sufficient deflection.
I first called the Northwest Wall and Ceiling Bureau (http://www.nwcb.org/ncbright.html).
In case you haven't met them, the people at the NWWCB are a great
resource for plaster and drywall questions. After thinking it over
for a while, they couldn't remember even a single incidence of a
partition failure due to deflection. This observation came from
two specialists who have investigated every imaginable type of interior
wall failure. Thinking there must be some mistake, I talked to Al
Andrew, the layout chief for Vertecs Company, a major wall finish
contractor. He said that he had once seen some minor crushing at
the top edge of some drywall in California, but that was it. Next
was Anita Washko of Wiss, Janney, Elstner Associates, a forensic
engineering firm that investigates building failures nationwide.
After conferring with other experts at WJE, she reported back that
there were no such failures showing up in any of their databases.
Unwilling to give up, I posted the question in three different on-line
discussion groups. My only response was from Jason Fell, Technical
Director of the Drywall Information Trust Fund in California, who
replied that he had heard of some failures of the V-groove type
of deflection tracks during the Northridge earthquake but had not
seen bowing or other deformations of partitions due to deflection.
(Later, I did uncover one instance of deflection damage locally.
In that case, a tall lightweight partition had been built tight
to the long-span structure above in a conference facility. The metal
studs took on the whole structural load and bowed out noticeably.)
If Deflection Is Not a Problem, Why Bother?
The answer to my earlier question "What happens when you don't provide
enough deflection capacity?" seems to be "Generally, nothing."
I called Bob Anderson, a principal and senior structural engineer
with Skilling Ward Magnusen Barkshire, to get an explanation. "Bob,"
I said, "you keep telling us that we have to accommodate a half-inch
of deflection, but even the most knowledgeable experts in the region
have never seen any deflection damage to interior partitions. Partitions
erected thirty years ago with no deflection control at all are still
completely intact. What is going on?" (Finally, I thought, I've
got him cornered.) "Metal stud partitions have a certain amount
of 'give' in them, Duane," he answered. "There is generally a little
gap between the stud and the track, and the connections are rather
soft. This will allow a modest amount of deflection to take place
without loading up the studs. If deflection progresses beyond that
point, the studs will carry the load down to the floor below. Since
these loads tend to be applied axially, even light gauge studs will
perform quite well, and the gypsum board screwed to each side will
constrain them from bowing or twisting."
"So how much deflection do we have to accommodate now?" I asked.
"Sorry, Duane. You still have to accommodate the full half inch,"
he replied, "but maybe your partition assembly itself absorbs some
of that movement."
Three Categories of Head-of-Wall Joint Assemblies: Mechanical,
Sealant & Membrane Systems
The various fire-rated head-of-wall joint systems can be divided
into three categories: mechanical, sealant bead and sprayed membrane.
(For this article, only metal stud partitions with drywall faces
are considered, but most of these systems also offer variations
for masonry partitions as well.)
Mechanical
The
"mechanical" assemblies include some familiar brand names such as
Fire Trak, Slip Track and Metal-Lite. Each of these systems has
a head assembly fixed to the structure above that allows the main
wall assembly to slide up and down within it. Deflection movements
are accommodated by allowing one component to slide past another.
The head assembly includes an apron or valance made of drywall or
metal angles, and the decking flutes above are sealed with fire-resistant
material. These systems offer movement capability from 1û2-inch
up to as much as three inches in each direction, and are generally
the most expensive options.
Sealant Bead
The
second category of assemblies accommodates deflection by stretching
and compressing a bead of fire sealant. With these systems, and
there are dozens, a thick bead of resilient fire sealant is applied
between the top of the drywall and the decking above. The allowable
movement is typically in the range of 1û4-inch in each direction
(1/2-inch total). Where the wall runs perpendicular to the decking
ribs, these systems typically require the top edge of the drywall
to be "castle cut" to the profile of the metal decking above, or
else they are tested for compression force only and not extension.
The "castle cut" is an expensive and time-consuming drywall detail
that should be avoided where possible.
Note that many of the "sealant bead" assemblies rely upon a seal
with the top cut edge of drywall. It would seem that any movement
in extension would pull a layer of gypsum dust off the top of the
panel and leave a gap. Another problem is that, without a bond-breaker
membrane along the side, the sealant could bond to the adjacent
top track, greatly limiting its actual movement capability.
Sprayed Elastomeric Membrane
The
third category, elastomeric sprayed membrane systems, includes products
by Hilti Construction Products, Specified Technologies, Rectorseal,
3-M and others. They are typically spray-applied in a layer 1/8-inch
thick, overlapping the drywall face below and the metal decking
above. Some of them have also been tested to adhere to structural
steel fireproofing such as Cafco 300 or Grace Monocoat MK-6. The
decking flutes above the wall are typically filled with compressed
mineral wool, which acts as a form for application of the sprayed
membrane. The products are so similar in application and tested
capabilities that they are virtually interchangeable. Each one,
however, must be installed according to the details specified in
its own UL tested assembly.
These sprayed products are considerably less expensive and faster
to install than the mechanical systems and have greater movement
capability than the sealant systems. Earlier versions of these products
allowed only 3/16 to 3/8 inch of compression or extension (3/8-inch
to 3û4-inch total). However, Hilti, Rectorseal and Specified Technologies
now have listed systems that will accommodate 1/2-inch of movement
in each direction (1-inch total). This solves the deflection problem
neatly, in that the most economical system type now meets all of
our performance standards. Considering that deflection damage has
never been much of a real-world problem in the first place, these
products provide an ideal solution.
Some of these UL approved systems are new enough that their most
current version does not appear in the year 2000 UL Directory. UL
now has its listed head-of-wall systems available online at http://www.ul.com/database/index.htm.
Since these systems are continually being replaced and updated,
this will make it easier to check on the latest approvals, and perhaps
you can finally toss your ancient copy of the UL Directory. (Intertek
Testing Services is the testing lab for Sliptrack Systems, but there
does not seem to be any online listing of tested assemblies at Intertek.)
CONCLUSIONS AND RECOMMENDATIONS
Here, then, are my conclusions and recommendations. Some of the
salespeople and manufacturer's I've spoken with may feel their products
have been slighted. However, different conclusions could be warranted
where the structural system, partition type or markets for labor
and materials differ from the assumptions in this analysis. (This
is also an appropriate moment to clarify that this recommendation
is my opinion alone and does not necessarily represent the viewpoint
of my employer or of the Puget Sound Chapter of CSI.)
General Recommendation
In general, specify and detail elastomeric spray-applied membrane
systemsÖ Where a one-hour or two-hour rated head-of-wall deflection
joint is required for an interior metal stud partition, specify
one of the elastomeric spray-applied membrane systems that has been
tested for 1û2-inch of movement each direction (one inch total movement).
This currently includes: …
- CP672 Fire Spray, by Hilti Construction Chemicals …
- Metacaulk 1200 and Biostop 750, by Rectorseal …
- SpecSeal AS200 Elastomeric Spray, by Specified Technologies
Inc.
But accept any of the mechanical systems at the contractor's option.
I would also allow as an option any of the mechanical systems that
has been tested for 1û2 inch of movement in each direction (except
in tight ceiling conditions, see next paragraph). My view is that
the cost of the mechanical systems will come down in response to
the competition from the sprayed membrane systems. The choice can
then be left to your contractor. Require submittal of the proposed
manufacturer's details showing the installation parallel to the
decking, perpendicular to the decking, crossing structural beams
and at any other typical or special conditions.
Recommendations for Special Conditions
Conflict
With Pipes and Conduit Close to Decking One condition under which
the mechanical joint systems should definitely not be allowed is
in tight construction situations where pipes, conduit or ductwork
need to run within a few inches of the decking above. Almost all
of the mechanical systems include an attached strip of drywall that
extends down several inches and must be free to slide up and down.
Therefore, the top of any pipe or conduit penetrating the wall would
have to be positioned several inches below the decking, wasting
valuable ceiling cavity space. Keep in mind that the fire-rated
pipe or duct penetration assembly itself often requires a flange
at the wall, which would further lower the penetration.
Joints Exposed to View In most situations, the head-of-wall joint
will be concealed in a ceiling cavity. In an exposed structure condition,
consider the finished appearance of the joint and the method of
filling the decking flutes above. This may warrant use of one of
the more expensive mechanical configurations. Latex paint can be
applied to some of the sprayed membrane systems, but will crack
if the joint experiences movement.
Deep Deflection Conditions If a fire-rated head-of-wall deflection
joint is expected to experience substantially more than 1û2-inch
of movement in each direction, as sometimes occurs in long span
structures such as convention centers and warehouses, use one of
the mechanical systems that has been tested for more extensive deflection.
Fire Trak has systems tested to 3 inches of movement in each direction.
(If you're expecting more than 3 inches of deflection, maybe you
should find a new structural engineer.)
"Secure Attachment" of Studs Sprayed elastomeric membrane assemblies
typically allow the studs to slide up and down within the top track,
so that the studs are held in line vertically only by the drywall
panels on each side. Select a system that uses slotted top track
or nested deflection track where one of the following conditions
exists: (1) local code interpretations require "secure attachment"
between the studs and the top track, (2) drywall is applied only
to one side of a partition, or (3) imbalanced loads might be expected
from heavy shelving or other wall-mounted elements. Check with the
specifics of the test report from UL or Intertek for allowable configurations.
The Specified Technologies (STI) elastomeric systems are tested
both with and without a nested deflection track. SlipTrak slotted
top track can be substituted for standard top track with most assemblies,
and Firetrack offers an optional clip system to hold the studs in
alignment. (On the other hand, I haven't yet heard of studs falling
out of partitions that lack "secure attachment".) Where secure attachment
is not provided, many systems call for a long-leg top track to provide
a secure sleeve within which the stud slides.
Support of Track Parallel To Decking Flutes
Where
the partition runs parallel to the flutes of the metal decking above,
provide adequate anchorage for the top track where one or both edges
of the track are unsupported. Some systems require 2-inch wide metal
straps or a continuous plate spanning between the decking ribs.
This condition has not been clearly addressed by all of the manufacturers.
Where only one side of the top track is secured to the decking rib,
my recommendation (not specifically tested by the manufacturers)
is to provide sections of J-furring or Z-furring in the decking
flute above to stabilize the unsupported side of the track. Remember
to fill the flute above with compressed mineral wool.
Application Over Structural Steel Fireproofing Many of these elastomeric
fireproofing membranes can be applied directly onto cementitious
or fibrous sprayed fireproofing (such as Grace Monokote or Cafco
300) on the metal decking. Generally this requires the elastomeric
sprayed fireproofing to overlap 2 inches onto the structural steel
fireproofing instead of the 1û2-inch overlap that is required for
application to metal decking.
RECOMMENDATIONS FOR ALL PROJECTS
Pre-Application Inspection For Sprayed Membrane Systems
The specification should require that the entire system, including
the compressed mineral wool in the decking flutes, be inspected
just prior to the application of the spray. The studs and drywall
should be checked to be sure that they have not been inadvertently
fastened to the top track. (Installation crews, trying to do a good
job, will often screw the studs to the track, or use temporary screws
to hold the studs in place during drywall application and then forget
to remove them.) The spray itself should be randomly tested after
application to assure that the required thickness, usually 1/8-inch,
has been applied. This 1/8-inch wet thickness will dry to approximately
1/16-inch.
Use Only the Listed Brand-Name Components Each of the tested assemblies
listed by UL or Intertek requires certain brand-name components,
and substitutions are not generally allowed. A drywall contractor
on one of our projects decided to save some money recently by fabricating
his own track to match the proprietary system we specified. When
the manufacturer of the specified track discovered this, a patent
infringement lawsuit was promptly filed which became quite painful
for the subcontractor.
Details
Details
in the drawing set should illustrate conditions where the partition
runs parallel to the decking flutes, perpendicular to the decking
flutes, directly below beams, adjacent to beams, and perpendicular
to beams. They should be customized to show whether structural sprayed
fireproofing will be applied to beams and/or decking.
Note that most of these systems are tested only for one or two typical
conditions, leaving the architect or contractor to improvise at
conditions for which no detail has been tested. Sloping rooflines,
irregularly shaped penetrations, and radiused walls would each require
special consideration and some extrapolation of the tested assembly
performance.
Another approach to detailing is to draw no details at all, but
rather to rely upon a carefully-worded specification and the shop
drawing review procedure. The risk taken with this approach is that
the bidders, while perhaps legally obligated to provide the desired
system, may not have been fully educated about the nature and extent
of the details they are to provide.
Specifications
At my firm, the specifications for head-of-wall joint systems are
contained in Section 07840, Firestopping, and Section 09100, Metal
Support Systems. AIA Masterspec puts fire-rated, proprietary head
of wall deflection assemblies in Sexction 09260 - Gypsum Board Assemblies.
The firestopping section, which also specifies systems for rated
wall penetrations and perimeter gaps, requires that the head-of-wall
joint be a tested assembly which meets the fire rating requirements
of the partition as well as the stated deflection requirements.
The required compression and extension distance for the joints should
be stated in this section, or else a specific reference should be
made to another location in the contract documents. The section
should specify a spray-applied elastomeric membrane system and also
allow, at the contractor's option, one of the mechanical systems
specified in the Metal Support Systems section.
Product Evaluation Summary
Consider the following product characteristics when evaluating proposed
assemblies:
- Deflection distance - Does the tested degree of extension
and compression meet structural deflection requirements? …
- Fire rating - Does the proposed system offer the same fire
rating as each of the partitions where it will be installed?
…
- Depth of joint system - Can penetrations for ductwork and
conduit be made tight enough to the structure above? …
- Listed components - Do all of the proposed system components
match those in the tested configuration? …
- Compatibility - Is the proposed system appropriate for the
surfaces to which it will be applied? (Check for structural
steel fireproofing, coatings, environmental conditions such
as condensation and temperature, etc.)
Conclusion
Although deflection at head-of-wall joints has rarely caused damage
to partitions in practice, current building codes require that we
provide tested assemblies at all fire rated wall heads. The available
systems vary widely in cost and movement capabilities, and new or
modified systems are constantly being introduced. Therefore, the
specifier would be well advised to keep an open mind and write specifications
to allow the least expensive solution that meets the stated criteria.
(Just remember to state the criteria somewhere!)
The answer to the earlier question "Why Bother?" is this; Properly
installed, the head-of-wall joints will work in concert with rated
penetrations, protected openings and slab edge assemblies to provide
a complete fire containment envelope. Years from now, a potentially
disastrous fire might be restricted to a minor one-room incident
due to the diligent detailing of each of these fire-rated assemblies.
Your efforts would be a small price to pay to protect the lives
and wellbeing of your future building users.
Appendix
CSI Member Comments, Corrections and Experiences
Please contribute your thoughts to this article mailto:djonlin@nbbj.com.
Comments and experiences from CSI members would be most welcome
and will be posted periodically. (We will remove your name if you'd
like to remain anonymous.)
Comments From the Manufacturers
The product manufacturers mentioned in this article are invited
to post responses so that they can offer their own viewpoints djonlin@nbbj.com. Further responses and dialogue will be included on this
site as requested.
Acknowledgements
Editorial comments on earlier drafts of this report were generously
provided by the following: Dace Campbell, AIA, Ed Storer, CSI, Anita
Washko, CSI, Chris Dixon, CSI, Fred Novota, CSI, Don Breiner, AIA,
John Jeffcot, CSI, Carroll Bryan, CSI, and Rob Lyons, CSI. The substance
and style of this paper were greatly improved by their efforts.
Chris Dixon, CSI, did the final editing, the layout design and conversion
to HTML.
The Technical Committee of the Puget Sound Chapter of CSI provides
this research in the pursuit of technical excellence for its members.
Reproduction of any portion of the text or images in this report
for other than personal use is subject to permission of the author.
Mechanical System Manufacturers
Elastomeric Sprayed Membrane System Manufacturers
Assembly Comparison
| Mechanical Systems |
| Manufacturer |
Assembly |
Rating |
Movement |
Notes |
| FireTrak |
HW-D-0060 |
1,2 HR |
1" (2" total) |
Shadowline |
| FireTrak |
HW-D-0061 |
1,2 HR |
1" (2" total) |
Same parallele to decking |
| FireTrak |
HW-D-0117 |
1,2 HR |
1" (2" total) |
Shadowline w/structural fireproofing |
| FireTrak |
HW-D-0118 |
1,2 HR |
1" (2" total) |
Shadowline w/sealant or elastomeric |
| FireTrak |
HW-D-1011 |
1,2 HR |
3" (6" total) |
Shadowline |
| FireTrak |
HW-D-1012 |
1,2 HR |
3" (6" total) |
Parallel to deck |
| FireTrak |
HW-D-1019 |
1,2 HR |
3" (6" total) |
Shadowline w/structural fireproofing |
| FireTrak |
HW-D-1020 |
1,2 HR |
3" (6" total) |
Shadowline w/sealant or elastomeric |
| Sliptrack |
SSI/EJV60-02 |
1 HR |
1/2" (1" total) |
Slotted track/Cafco 300 |
| Sliptrack |
SSI/EJV120-02 |
2 HR |
1/2" (1" total) |
Slotted track/Cafco 300 |
| Sliptrack |
SSI/EJV60-03 |
1 HR |
1/2" (1" total) |
Slotted track/Cafco Blazeshield |
| Sliptrack |
SSI/EJV60-04 |
1 HR |
1/2" (1" total) |
Slotted track/WR Grace MK-6 |
| USG |
HW-D-0001 |
1 HR |
1/2-3/8" (7/8" total) |
GWB on metal angles |
| USG |
HW-D-0002 |
2 HR |
1/2-3/8" (7/8" total) |
GWB on metal angles |
| WR Grace |
HW-D-0050 |
4 HR |
5/8-3/8" (1" total) |
Fireproofing on metal angles |
| Metalines |
HW-D-0131 |
3 HR |
1/2" (1" total) |
Shaftwall sliptrack |
| Sprayed Elastomeric Membrane Systems |
| Manufacturer |
Assembly |
Rating |
Movement |
Notes |
| 3M/Sliptrack |
HW-D-0020 |
1,2 HR |
1/4" (1/2" total) |
Firedam Spray |
| 3M/Sliptrack |
HW-D-0029 |
1,2 HR |
1/4" (1/2" total) |
Firedam, parallel to deck |
| 3M |
HW-D-0031 |
2 HR |
1/2" (1" total) |
Firedam Spray |
| Rectorseal |
HW-D-0032 |
2 HR |
1/2" (1" total) |
Metacaulk 1200 spray |
| Rectorseal |
HW-D-0033 |
2 HR |
1/2" (1" total) |
Biostop 750 spray |
| Rectorseal |
HW-D-0058 |
2 HR |
3/8" (3/4" total) |
Metacaulk 1200 spray |
| Rectorseal |
HW-D-0059 |
2 HR |
3/8" (3/4" total) |
Biostop 750 spray |
| Rectorseal |
HW-D-0104 |
1,2 HR |
1/2" (1" total) |
Metacaulk, parallel to deck |
| Rectorseal |
HW-D-0105 |
1,2 HR |
1/2" (1" total) |
Biostop, parallel to deck |
| Rectorseal |
HW-D-0125 |
3 HR |
1/2" (1" total) |
Metacaulk 1100, defl channel |
| Rectorseal |
HW-D-0126 |
3 HR |
1/4" (1/2" total) |
Biostop 750, defl channel |
| Hilti |
HW-D-0042 |
1,2 HR |
1/4" (1/2" total) |
CP 672 Firestop Joint Spray |
| Hilti |
HW-D-0049 |
1,2 HR |
1/2" (1" total) |
Parallel to decking |
| STI |
HW-D-0043 |
1,2 HR |
3/16" (3/8" total) |
Specseal Elastomeric Spray |
| STI |
HW-D-0054 |
1,2 HR |
1/2" (1" total) |
Parallel to decking |
| STI |
HW-D-0088 |
1,2 HR |
3/16" (3/8" total) |
Specseal Elastomeric Spray |
| STI |
HW-D-0099 |
1,2 HR |
3/16" (3/8" total) |
Sprayed fireproofing at deck |
| STI |
HW-D-0120 |
1,2 HR |
1/2" (1" total) |
Sprayed fireproofing in flutes |
Assembly: UL Assembly listing number, except Intertek listing number
for Sliptrack Systems
Movement: First figure is allowable joint movement in one direction
only. Second figure (in parentheses) is total movement for extension
and compression. Assemblies are tested perpendicular to decking
flute direction except where noted otherwise in Notes column.
General Note: This listing is not comprehensive. "Sealant Bead"
systems were omitted, as were most systems that were tested only
for small movement capabilities. In addition, none of the concrete
or masonry assemblies is listed or discussed here.
Many more systems can be viewed online at www.ul.com/database/index.htm.
|